Microsoft Project 2010 : Using Filters and Highlights (part 1)

10/29/2011 5:18:10 PM
This section discusses using predefined filters and highlights, which allow you to zero in on specific subsets of data for more effective communication and reporting. Although Project comes equipped with many predefined filters, you can also create your own. This section also covers how to create custom filters.

1. Using Predefined Filters

Project comes with predefined filters you can use as is. Filtering works by displaying only a set of line items (phases, tasks, milestones) based on a specific criterion or condition. When the specified condition is applied, Project presents those items that satisfy the condition in the view in which you apply the filter. For example, as shown in Figure 1, if you want to view milestones only, you can apply the Milestones filter, which is based on the condition of the Milestone field being equal to Yes. To apply the Milestones filter, follow these steps:

  1. In the Gantt Chart view, go to View tab => the Data group.

  2. Beside the Filter button, click the drop-down list that says [No Filter].

  3. From the drop-down list, select Milestones.

To clear a filter, you can select Clear Filter or [No Filter] from the same filter list. At lower left in the window, in the status bar area, Project displays Filter Applied if you're running a filter.

Figure 1. Applying a Milestones filter

Many useful filters appear in this list, such as the Using Resource filter. In Figure 2, I've filtered by all the tasks David Blair is working on so I can meet with him to review his workload on this project. When you apply the Using Resource filter, you're prompted to select a resource from the resource pool list.

The Date Range filter lets you focus on tasks over a specific period. For example, if you're getting ready for a project-review meeting and you want to review the tasks that are coming up for the next week or month, you can run the Date Range filter. When you apply this filter, you're prompted for the following two items:

  • Show tasks that start or finish after

  • And before

Figure 3 is an example of a Date Range filter that displays only tasks for the month of October.

Project shows the most commonly used filters in the initial drop-down list, but you can access additional predefined filters, as shown in Figure 4. Follow these steps:

  1. Select Task tab => Data group => Filter button drop-down list => More Filters.

  2. In the More Filters dialog box, scroll down to review and select other filters.

  3. Click Apply.

Figure 2. Applying the Using Resource filter

Figure 3. Applying the Date Range filter

Figure 4. More Filters dialog box

The next section discusses how to create custom filters. Take some time to review the predefined filters, because they come in handy when you need to communicate in various ways to project stakeholders.

2. Using Highlights

Highlights are similar to filters in that they use the same criteria and conditions to focus on a specific subset of data. However, instead of removing line items from the project plan that don't match a condition, highlighting keeps all the line items in view and highlights the items that meet the condition.

For example, you may want to highlight milestones or the tasks that a specific resource is working on. To do so, you use the highlight function, as shown in Figure 5. In this example, I've highlighted the milestones by following these steps:

  1. Go to Task tab => Data group, and click the Highlight drop-down list.

  2. Select Milestones.

Figure 5. Applying milestone highlights

The default color for highlighted tasks is blue. You can change the font characteristics of highlights by modifying the text styles. As shown in Figure 6, to change the font or color of the highlights, follow these steps:

  1. Go to Format tab => Format group, and click the Text Styles button.

  2. In the Text Styles dialog box, from the Item to Change drop-down list, select Highlighted Tasks.

  3. Select the appropriate characteristics. You can apply different fonts, styles, sizes, and colors as desired.

Figure 6. Changing text styles for highlighted tasks
 
Others
 
- Microsoft Access 2010 : Other New Features Available in Macros & Testing a Macro
- Microsoft Access 2010 : Creating a Drillthrough Macro
- Microsoft Word 2010 : Creating a PDF Document
- Microsoft Word 2010 : Creating a Word Outline from a Presentation & Creating and Opening OneNotes
- Microsoft PowerPoint 2010 : Adding Sound to a Transition & Modifying Transition Speed
- Microsoft PowerPoint 2010 : Adding Transitions and Animations - Applying a Transition
- Microsoft Excel 2010 : Recovering a Workbook
- Microsoft Excel 2010 : Documenting Workbook Properties & Switching Views
- Microsoft Outlook 2010 : Working in the Calendar Module (part 2) - Calendar Item Windows
- Microsoft Outlook 2010 : Working in the Calendar Module (part 1) - Calendar Module Content
 
 
REVIEW
 
- First look: Apple Watch

- 10 Amazing Tools You Should Be Using with Dropbox

- Sigma 24mm f/1.4 DG HSM Art

- Canon EF11-24mm f/4L USM

- Creative Sound Blaster Roar 2

- Alienware 17 - Dell's Alienware laptops

- Smartwatch : Wellograph

- Xiaomi Redmi 2
 
Popular tags
 
Video Tutorail Microsoft Access Microsoft Excel Microsoft OneNote Microsoft PowerPoint Microsoft Project Microsoft Visio Microsoft Word Active Directory Biztalk Exchange Server Microsoft LynC Server Microsoft Dynamic Sharepoint Sql Server Windows Server 2008 Windows Server 2012 Windows 7 Windows 8 Adobe Indesign Adobe Flash Professional Dreamweaver Adobe Illustrator Adobe After Effects Adobe Photoshop Adobe Fireworks Adobe Flash Catalyst Corel Painter X CorelDRAW X5 CorelDraw 10 QuarkXPress 8 windows Phone 7 windows Phone 8 BlackBerry Android Ipad Iphone iOS
 
Top 10
 
- How To Install Windows Server 2012 On VirtualBox
- How To Fix Skype High CPU And Memory Usage In Windows 8
- Add 270 Additional Cleaning Options To CCleaner With CCEnhancer
- FPPT Provides More Than 2000 Free And Attractive PowerPoint Templates
- Setup Free Media Server To Stream Videos To DLNA Compatible TV, Xbox 360 & PS3 (Play Station 3)
- How To Install Android Market & Google Apps On Kindle Fire
- How To Make Ubuntu Look Like Windows 7
- How To Add A New Account in MS Outlook 2013
- Get Android & Mac OS X Style Gadgets For Windows 7 & Windows 8 With XWidget
- How To Activate Microsoft Office 2013
<