Applications Server
 

VMware View 5 : Establishing a Performance Baseline (part 5)

3/30/2015 12:32:41 AM

License vCenter Operations

vCenter Operations Manager looks to vCenter to supply a license. Therefore, the next procedure is to ensure a license key is installed in vCenter so that when you register vCenter Operations to the vCenter Server, it is properly enabled. To add a vCenter Operations License to vCenter, complete the following steps:

1. From the vSphere client, connect to vCenter.

2. From Home, select Licensing under the Administration section.

3. Select Manage vSphere Licenses (Note: It is the blue “Manage vSphere Licenses” hyperlink on the right of the screen to the left of the Refresh and Export links), as shown in Figure 9.

Image

Figure 9. Select Manage vSphere Licenses.

4. Enter the license key in the Enter new vSphere License Keys section and provide a label such as vOPs. Click Next.

5. Under Assign Licenses, click the Solutions tab and select Show All (see Figure 10). Select your vCenter Operations, select the license key, and click Next.

Image

Figure 10. Apply Licenses.

6. If you want to remove any license keys, do so; otherwise, click Next and Finish on the confirmation page to apply your license changes.

After it is installed, configured, and licensed, you can enable the plug-in to view the components of vCenter operations. To do this within your vSphere Client, select Plug-ins and Manage Plug-ins and enable the vCenter Operations Manager (see Figure 11).

Image

Figure 11. Install the plug-in.

To access vCenter Operations Manager, open your vSphere client, and from the Home tab, click vCenter Operations under the Solutions and Applications pane. You can also access vCenter Operations by browsing directly to the IP of the UI appliance, which can be quicker. It is important to realize that there is a relationship between the Hosts and Clusters tree view on the left and the display panels on the right. Certain objects in the tree on the left don’t display certain properties because they are not relevant to what you have selected. For example, virtual machines that are gray in color are typically not powered on. To get a high-level view of general health, select your datacenter on the left and ensure the dashboard is visible on the right (see Figure 12).

Image

Figure 12. Select your datacenter and view your dashboard on the right.

Notice that the datacenter has three high-level ratings more commonly referred to as badges in vCenter Operations. Each of these major badges is made up of a combination of minor badges to help you get a good picture of the environment. In general, Health is largely made up of real-time metrics, Risk looks at capacity and how long over a period of time the VMs may be stressed or struggling for resources, and Efficiency looks at how well you are currently using the environment. Efficiency includes a reference for optimal configurations such as your host-to-VM ratio or CPU-to-VM ratio.

The Health badge is a combination of Workload, Anomalies, and Faults. Workload measures the four pillars of performance in virtual infrastructure: CPU, Memory, Disk I/O, and Network I/O (see Figure 13). A high workload number indicates resources that are heavily utilized.

Image

Figure 13. The Workload badge.


 
Others
 
- VMware View 5 : Establishing a Performance Baseline (part 4) - Configure vCenter Operations
- VMware View 5 : Establishing a Performance Baseline (part 3) - Deploy vCenter Operations
- VMware View 5 : Establishing a Performance Baseline (part 2) - Create an IP Pool
- VMware View 5 : Establishing a Performance Baseline (part 1) - Installing vCenter Operations
- Sharepoint 2013 : Organizing people and work - Creating a calendar list - Switch calendar views
- Sharepoint 2013 : Organizing people and work - Adding multiple tasks and subtasks - Update multiple tasks in a standard view, Add subtasks
- Sharepoint 2013 : Organizing people and work - Viewing tasks in a Gantt Chart - Configure Gantt columns
- Sharepoint 2013 : Organizing people and work - Adding tasks - Add a task to a timeline
- Sharepoint 2013 : Organizing people and work - Creating a project schedule by using a tasks list - Create a project task list
- Sharepoint 2013 : Working with media - Adding media to a SharePoint page (part 2) - Insert video on a SharePoint page
 
 
REVIEW
 
- First look: Apple Watch

- 10 Amazing Tools You Should Be Using with Dropbox

- Sigma 24mm f/1.4 DG HSM Art

- Canon EF11-24mm f/4L USM

- Creative Sound Blaster Roar 2

- Alienware 17 - Dell's Alienware laptops

- Smartwatch : Wellograph

- Xiaomi Redmi 2
 
VIDEO TUTORIAL
 
- How to create your first Swimlane Diagram or Cross-Functional Flowchart Diagram by using Microsoft Visio 2010 (Part 1)

- How to create your first Swimlane Diagram or Cross-Functional Flowchart Diagram by using Microsoft Visio 2010 (Part 2)

- How to create your first Swimlane Diagram or Cross-Functional Flowchart Diagram by using Microsoft Visio 2010 (Part 3)
 
Popular tags
 
Video Tutorail Microsoft Access Microsoft Excel Microsoft OneNote Microsoft PowerPoint Microsoft Project Microsoft Visio Microsoft Word Active Directory Biztalk Exchange Server Microsoft LynC Server Microsoft Dynamic Sharepoint Sql Server Windows Server 2008 Windows Server 2012 Windows 7 Windows 8 Adobe Indesign Adobe Flash Professional Dreamweaver Adobe Illustrator Adobe After Effects Adobe Photoshop Adobe Fireworks Adobe Flash Catalyst Corel Painter X CorelDRAW X5 CorelDraw 10 QuarkXPress 8 windows Phone 7 windows Phone 8 BlackBerry Android Ipad Iphone iOS
 
Top 10
 
- VMware View 5 : Establishing a Performance Baseline (part 10)
- VMware View 5 : Establishing a Performance Baseline (part 9)
- VMware View 5 : Establishing a Performance Baseline (part 8)
- VMware View 5 : Establishing a Performance Baseline (part 7)
- VMware View 5 : Establishing a Performance Baseline (part 6)
- VMware View 5 : Establishing a Performance Baseline (part 5)
- VMware View 5 : Establishing a Performance Baseline (part 4) - Configure vCenter Operations
- VMware View 5 : Establishing a Performance Baseline (part 3) - Deploy vCenter Operations
- VMware View 5 : Establishing a Performance Baseline (part 2) - Create an IP Pool
- VMware View 5 : Establishing a Performance Baseline (part 1) - Installing vCenter Operations